Progress.
Lots of it.
On the first floor of the house.
In the basement.
There's still a lot left.
And a lot of waiting.
Before we can start putting up tiles.
The concrete floor has to be completely dry.
This summer has been the worst possible.
When it comes to drying concrete.
Hot and humid.
Therefor we need to speed up the process.
First we put in electric radiators.
And a fan to spread the heat.
For some extra warmth.
We sometimes fired up the sauna.
Then came our plumber along.
And connected the floor heating.
If that doesn't help I don't know what will.
It's kind of frustrating to wait.
All though we always have lots to do.
Kind of funny to have.
Floorheating in a house.
Without a bathroom.
Kitchen.
And so on.
Long time, no see
2 år sedan
Inga kommentarer:
Skicka en kommentar